AU Class
AU Class
class - AU

Why Is BIM Inefficient? And How Can Our Industry Fix It?

Compartir esta clase
Busque palabras clave en vídeos, diapositivas de presentación y materiales:

    Descripción

    Over the last 20 years, building information modeling (BIM) has changed how our industry operates and interacts through all phases of design and construction. While our industry has taken steps forward by implementing BIM, there are still many inefficient processes and still many steps to take to continue to evolve how our industry works together and uses technology. The design industry has vastly changed through use of software like Revit. While creating efficiencies, it has also created gaps. Drawing notes such as "field verify,” "GC to verify,” and "See XYZ Drawing" still limit the coordination of documents from the design process. Contractors' use of BIM has also continued to evolve and expectations have changed. The challenge of "design intent" versus "means and methods,” which existed long before 3D modeling software, is more relevant in the world of BIM. Do contracts help or hurt us? How can we as an industry change this?

    Aprendizajes clave

    • Explore why the industry is not maximizing our tools and talents.
    • Explore the inefficient process we have during design and construction.
    • Learn how contracts are helping and hurting us to move forward.
    • Explore ideas and creative ways to continue to move our industry forward.